From: route@monster.com
Sent: Friday, April 29, 2016 3:31 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Syed F Imam Bachelor
Degree-Electronics and Communication Engineering Visa
Status: Green Card Email: firaz.imam@gmail.com Summary ·
More
than 12 years of professional experience in Telecommunications industry
progressing through the ranks with increasing responsibilities to lead a
large talented team of subject matter experts in support of customer
deliverables. ·
Experienced
on Sprint Samsung LTE Tri-band (2500, 1900, 800) including Samsung CDMA/EVDO
Optimization, Sprint TDD 2.5GHz NSN design for Tennessee market (used
Planet), worked for Nextel Mexico UMTS design project (used Aircom ASSET
design and Capesso optimization tool). Responsibilities involved to meet
customer requirements in terms of LTE / CDMA KPI. UMTS design
responsibilities involved to meet customer requirements in terms of RSCP and
Ec/Io per market level. Provided short term solution with only Electrical
tilts variants and long term solution with new sites, new sector adds. ·
Improved
the LTE traffic and Samsung LTE/CDMA/EVDO KPI of Cincinnati market. MAHHO
setup done for IFHHO. Worked on Sprint CDMA/EVDO RF Networks (Network
Advantage and Network Vision Sites) of market and improved the CDR (Call
dropped rate) by 20% through optimization recommendations. Experienced on
analysis and recommendation of Call drop rate (CDR), Call block rate, Call
Failure rate (CFR), optimization of network by identification of actual root
cause like overshooting analysis, Pilot pollution identification, Neighbor
tuning (add, delete, priority change) by ituneNL Web tools as well as by HOMAX
from Reveal, critical alarm identification as well as current alarm lookup
from Alcatel-lucent ECP login (used Procomm Plus and Putty Software), NTAC
Web tools for Lucent alarm events log, CCU/EVM Card utilization analysis,
CCU/EVM Card configuration analysis, Capacity analysis of Sprint CDMA/EVDO.
Did analysis and provided the recommendation for RF Network Optimization of
market. RF tool used are Samsung LSMR, Samsung BSM, RF Cockpit, Reveal PCMD
Tool, Falcon – RFISS – Active Cell site database, Mentum Planet, Nokia
NetAct. Overshooting Sector identification analysis by plotting reveals data
in MapInfo, Mentum planet prediction as well as directly monitoring in Reveal
web tool. ·
Having
experience of RF engineering especially RF Site Survey, Load Centre (Nominal
/ Search Ring) creation of New Cell Site (New Town Site, Highway Site and
Capacity Site) & Cell Site finalization for CDMA and GSM Network
expansion. Also done IBS (In building BTS Site / Repeater) Survey, Planning
and supervise installation and RF quality checks after operation. Done MW LOS
survey for Reliance. · Done the Carrier up gradation in CDMA Lucent Modcell 3.0,
ModCell 4.0, ModCell 4.0B, C4400 and power saving work in ModCell 4.0B.
Identified and resolved the Carrier blocking issue (due to database-CMU
Configuration issue and some cases of CE blocking due to fault in particular
carrier of CMU), Pn conflict, and Carrier dissimilarity issue of Cell Site.
Drive Test & Optimization of CDMA Cell sites using Agilent E6474A Drive
Test Kit. Improved the data speed in CDMA by parameter modification in
database of Cell Site and overall KPI improvement of my cluster. In GSM,
identified and resolved the database issues of TRX priority, BCCH Priority,
No. of SDCCH planning with respected to TRX, BCCH Interference. Professional
Accomplishments Nexius
Solutions, Inc., USA Feb 2014 – Dec 2015 RF
Engineer IV Project:
Sprint - LTE 2.5 GHz Optimization, Cincinnati (OH), USADec 2014 – Dec 2015 ·
Worked
on LTE Tri-band Optimization Project (2500, 1900, 800) and CDMA / EVDO RF
optimization of Sprint network - Cincinnati (OH). ·
Daily
end to end LTE/CDMA/EVDO multiband optimization including KPI performance for
Samsung system. ·
Worked
on top KPI offender Sectors / Sites. Hardware issue, UL RSSI issues,
Interference issue identification for the problematic sites. Identifying and
resolution of PCI overshooting, PCI Confusion. ·
Worked
for IFHHO issue of CDMA Sites. MAHHO Setup done. CDMA pilot pollutions, PN
Conflict identified. ·
CDMA
NL retuned (Add/delete/NL prioritization/Overshooting) by HOMAX as well as
cross validated. ·
Using
Planet and MapInfo for design and physical optimization for the sites for
LTE/CDMA. ·
Worked
on Cluster Optimization and improvement. Customer complains resolution within
SLA. · Drive test data analysis through WindCatcher for Layer 3
log files and troubleshooting for network KPI improvement. · Created the ticket by TRAMS for hardware, RSSI Issue,
Interference Issue. · Analyzed & submitted the
recommendation for LTE KPI improvement (CDR, CFR, Handover, DL /UL
throughput, DL / UL tonnage) & traffic management. Analyzed RRC drop
rate, RRC connection set up failure, handover analysis, RSRP, RSRQ, SINR, DL
throughput, UL throughput by layer3 log analysis through WindCatcher. PCI
Confusion, RET (Remote Electrical tilt), sometimes mechanical tilt changes,
parameter changes, NBR and PCI optimization done. Moved more traffic on LTE.
Traffic management as per Sprint LTE band traffic priorities are 2500à1900à800. Troubleshoot the Antenna
Beamforming issue and MIMO. Analyzed & submitted the recommendation for
CDMA KPI improvement (Call Drop Rate, Call failure rate, Call block). Worked
on improvement of RX level, Ec/Io, Pilot pollutions, IFHHO Set up after MAHHO
implementation. Checked RSSI/VSWR/Return Loss/Hardware alarm. NL audit and
retuned as per HOMAX and manual verification in MapInfo for overshooting or
PN conflict or pilot pollutions. Project:
Sprint - LTE 2.5 GHz Design, Nashville (TN), USA Feb 2014 – Dec 2014 ·
LTE
TDD 2.5GHz support for Memphis and Arkansas market. ·
Managing
all pre-launch activities including Neighbor List Audits, Parameter Audits,
Site ATP, and Key Performance Indicators. ·
Site
Audit by using Engineering Site Survey Document and by construction diagram. ·
Identified
D1 & D2 collision by planet and generate Predictions. · View Predictions (RSRP) for each
D2 site and nearest D1. · Work on market level CIQ, RFDS Template. Savvion updates,
RFDS creation, validation and upload. Monitor No Harm. ·
Sweep
review and validation. ·
Responsible
for LTE 2.5 design, implementation & optimization (ATP). ·
Review
LTE 2.5G site ATP using WindCatcher (Peak Throughput, CSFB Handover, Latency,
Intra - Sector Handover). ·
Handling
end to end responsibility of execution of 2.5 design approval to ATP (used
XCEED Windcatcher). · Provided recommendation to RSD on structure failure cases
(Antenna type / azimuth). Submitted CR Forms and did the desire changes in
RFDS on Xnergy/Savvion after CR approval and upload the new approved RFDS on
Siterra. ·
Recommended
3 RRH configurations in 4T4R NSN plumbing diagram to minimize the sectors
outage by 50%, revenue loss saved and improved sector availability for mobile
user satisfaction. Plumbing diagram amended from 2RRH to 3RRH to maximize the
sector availability for Sprint customer satisfaction. Recommendation implemented
and appreciated from planning team. Tool used: ·
Reveal,
RF Cockpit, Tableau, Siterra, Falcon, Savvion, TRAMS. ·
Samsung
LSMR, Samsung BSM, Nokia NetAct, NSN OSS, WinScp. ·
WindCatcher,
Mentum Planet EV. Consultant,
Dallas (TX), USA Apr 2013 – Dec 2013 Senior RF
Engineer Project:
Mexico Nextel UMTS Network RF Optimization and design July 2013 – Dec 2013 ·
Worked
for Aircom International, Dallas (TX) through USR Systems. Did RF
optimization and RF design / planning for Mexico Nextel UMTS Network Phase2
markets. ·
Worked
on Aircom Asset design and Capesso optimization tool for Nextel Mexico UMTS
Design project. ·
The
primary design markets involved are Mexico City, Tula and Toluca during
Phase-1 (July 2013-Oct 2013). For Phase2, worked on different markets (Xalapa,
PozaRica, Veracruz etc.). ·
UMTS
Design responsibilities involved to meet customer requirements in terms of
RSCP and Ec/Io per market level. Providing UMTS Design for on short term
solution with only Electrical tilts variants and long term solution with new
sites, sector adds. · Short term solution prepared with coordinated efforts of
optimization teams and AIQ teams recommendations. Also did drive test
processing and analysis in TEMS. · In-depth understanding of the details surrounding Radio
Frequency (RF) network design, capacity planning, optimization and
performance management engineering. · Google Earth experienced and created KMZ/KML Sites file
for Google earth. Project:
Sprint CDMA & EVDO RF Optimization Apr 2013 – June 2013 ·
Worked
on Sprint CDMA & EVDO RF Optimization Project – Phase 1 – 2013. ·
Worked
on Sprint CDMA/EVDO RF Networks (Network Advantage and Network Vision Sites)
of Baltimore market and improved the dropped call rate by 20% through
optimization recommendations. ·
Analysis
and recommendation of Call drop rate, Call block rate, optimization of
network by identification of actual root cause like overshooting analysis,
CDMA PN conflicts, Pilot pollutions identification,
Neighbor tuning (add,
delete, priority change) by ituneNL Web tools as well as by HOMAX, critical
alarm identification as well as current alarm lookup from Alcatel-Lucent ECP
login (used Procomm Plus and Putty Software), NTAC Web tools for Lucent alarm
events log, CCU/EVM Card utilization analysis, CCU/EVM Card configuration
analysis, Capacity analysis of Sprint CDMA/EVDO. ·
Did
analysis and provided the recommendation for RF Network Optimization of
Baltimore market. RF tool used are Reveal PCMD Tool, Falcon – RFISS – Active
Cell site database, RF Cockpit, Mentum Planet. ·
Overshooting
Sector identification analysis by plotting reveals data in MapInfo, Mentum
planet prediction as well as directly monitoring in Reveal web tool. Tool
used: ·
Aircom
ASSET design and Capesso optimization. ·
Reveal
PCMD Tool, Falcon – RFISS – Active Cell site database, RF Cockpit, Glance. ·
Procomm
Plus, Putty Software for alarm, NL check, database check etc. ·
NTAC
Web tools for Lucent alarm events log, CCU/EVM Card utilization analysis. ·
Mentum
Planet ·
TEMS
Investigation and TEMS Discovery ·
Site
Master (Bird, Anritsu) ·
Power
Meter (Agilent & Anritsu) ·
Map
info 11.5 software, Microsoft Streets & Trips, Google Earth Pro. ·
Agilent
6474A Drive Test kit. Alcatel-Lucent
Managed Solutions India Pvt LtdOct 2008 – May 2012 Team Lead
- Manager Network Took up this role as a result of joint venture
formation of the company and quickly positioned as a dependable partner to
other groups in the organization, specifically: ·
Responsible
for maintaining the M/S Reliance Communications Limited Wireless Cellular
Network (CDMA 1X, GSM 2G & GSM 3G) as per standard quality norms. ·
Managed
the team of BSS Engineers, RF Engineers, BTS SME’s & RF SME’s. ·
Worked
with regional operations/engineering and NNOC management to ensure network
quality. ·
Routine
monitoring and review of radio network Key Performance Indicators (KPI). ·
Responsible
for maintaining the KPI per agreed SLA with customer. ·
Partnering
with OSP / Fiber and Transport teams to minimize the outage time. ·
Proactively
monitoring & resolving customer complaints within agreed upon SLA. ·
Analysis
of daily RAN reports for CDMA & BBH for GSM and KPI monitoring on daily
basis for GSM & CDMA through Web Site. ·
Ensuring
Network Operations and maintenance is performed as per quality standards
& within SLA. ·
Reviewing
and acting on reports from Daily Site alarms & faults, Sleeping or Zero
Call in sector and weekly performance report received from Circle. ·
For
revenue enhancement and quality improvement (GSM/CDMA voice/data), assisted
Business Cluster Lead for business processes (i.e. approval from CEO and CCH)
of New Cell Site/IBS Solutions (BTS/Repeater) and follow-up with all
concerned team throughout the installation and operation of New Cell Site/IBS
Solutions as well as quality verification from both technical & business
executive team. ·
Developing
proposals based on congestion report for the additional carrier and capacity
requirements and analysis & confirmation of root causes for faulty card
to reduce future fault rate. ·
Timely
execution and log file submissions of preventive maintenance of BTS &
BSC. ·
Work
closely with managers and project team members to assess/meet department
goals. ·
Work
with engineering departments to ensure that all software updates are handled
correctly and all installation and testing activities. · Leading, motivating and encouraging the team to exceed the
targets and enable quick and most cost effective solutions. Manages costs and
related expenses. Having good understanding of Multi technology (GSM, GPRS,
EDGE, UMTS, WCDMA, CDMA and LTE). · Strong working experience in RF optimization, Neighbor
List Optimization and Layer Management in Multi Technology / Multi Carrier /
Multi Band Networks. Reliance
Communications Limited, Patna June 2004 – Sept 2008 RF
Engineer ·
Responsible
for maintaining the KPI as per agreed SLA with customer. ·
Carrier
upgrades in CDMA Lucent BTS’s (Mod 3.0, Mod 4.0, Mod 4B, C4400) & E1
addition for Capacity enhancement. Multi carrier optimization done. Also
worked for power saving work in ModCell 4.0B. ·
Monitoring
and analysis of KPIs through RAN reports. ·
Neighbor
List optimization done in FCI as per HOMAX. ·
BTS
Hardware outage root cause analysis & action plan for minimizing future
outages. ·
VSWR /
Return Loss Test and Swapping verification as required. ·
BTS
Problem Identification & corrective action to meet Performance standard. ·
BTS
Power Calibration, Preventive Maintenance and Troubleshooting of BTS. ·
RF
Site Survey & Site Selection for CDMA & GSM Network expansion. ·
Candidate
evaluation and finalization for Capacity Sites, New town & Highway Sites
after RF validation. ·
Did MW
LOS (Microwave Line of Site) Survey and recommendations during analysis. ·
RF
Optimization of site and Customer coverage issue (Outdoor/Indoor) resolution
by Tilt (Electrical/Mechanical) or azimuth change or parameter change or IBS
(BTS or Repeater) proposal. ·
Improved
the data speed in CDMA by parameter modification in database of Cell Site and
overall KPI improvement of my cluster. ·
Project
management and coordination for BSS/RF domain as well as Electrical domain
during BTS swap / New Cell Site Integration. Track the Call Testing &
alarm testing as well as organized respective Engineer for AT of new/Swap BTS
sites as per standard. · Directly attended the all critical
and major customer complaint for immediate resolution by online communication
and sometime by visiting the locations. · Solid understanding of RF
propagation principles, cellular theory, RF engineering tools and antenna
theory. Consultant,
Bangalore Mar 2004 – June 2004 Project
Trainee (RF Network) ·
RF
Survey for CDMA BTS Sites in Bangalore City & Suburb area. ·
Load
Center (Nominal / Search Ring) creation of New Site & Preparation of Site
Survey Form (RE1 Form). · Candidate evaluation and recommendation after RF
validation for Capacity, New town & Highway Site. · VSWR Test & Swapping verification of New Sites. Microsimm
India Private Limited, New Delhi Apr 2003 – Aug 2003 Service
Engineer ·
Preparation
of MDF and Cabling verification. ·
Installation
and Maintenance of Copper Cable Network, EPABX & Security Systems (Audio
Door Phone / Video Door Phone Systems & CCTV – Silent / One way / two
ways) of ALBA control System, Noida. ·
Total
cost estimation of above equipment’s at customer location. A & W
Electronics, New Delhi May 2002 – Mar 2003 Service
Engineer ·
Preparation
of MDF and Cabling verification. ·
Fault
diagnosis & rectification of Landline Telephone line. ·
Installation
and Maintenance of Copper Cable Network, EPABX & Security Systems (Audio
Door Phone / Video Door Phone Systems). ·
Total
Cost Estimation of above equipment’s in a Housing Society. Skills ·
IT
Skills: Proficient with MS Office, MS Excel, PowerPoint & Internet etc. Education
& Training · Bachelor’s Degree
in Electronics & Communications Engineering from India with First
Class with Distinction. Awards: ·
“Achiever
Club Award” in Alcatel Lucent Managed Solutions India Private Limited, Patna
for outstanding performance in maintaining the Quality of Network Services. · “Certificate of Excellence Award”
in Reliance Communications Limited, Patna for outstanding contribution to
growth of Business by maintaining good quality of service and customer
complain resolution within SLA of Patna. · “Received money and appreciation
from Alcatel-Lucent for maintaining the excellent quality of service during
TRAI audit. Reference: Available upon Request 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|